Application review
Container samples, label rolls, target output and line layout are reviewed before recommendation.
Services
Practical support from initial application review through to machine selection, installation planning and aftercare.
Need a bottle labelling machine specified quickly? Send bottle dimensions, label size and output target.
Request specification adviceCall 01494 623015Container samples, label rolls, target output and line layout are reviewed before recommendation.
Automation level, controls, sensors, coding and conveyor requirements are selected around the product.
Support for filling, capping, labelling, coding, inspection, conveyors and complete packaging lines.

Why Lancing
The best labelling machine is not chosen by model number alone. Lancing reviews the pack, label, process and site conditions to avoid instability, poor registration and slow changeovers.
Speak to Lancing
Include container dimensions, label size, label material, target output and the required label position. Lancing will recommend a suitable semi-automatic, compact or fully automatic configuration.
Specification, trials, installation and aftercare are easier to control when the project identifies who supplies application data, drawings, declarations, instructions, FAT evidence, site interfaces, training and open-action records.
Define the intended use, container and label range, line interfaces, site standards and evidence needed to approve the machine.
Record FAT results, open actions, manuals, drawings, software or recipe versions and responsibilities for site work.
Verify installed interfaces, guarding boundaries, training, maintenance information and the accepted operating configuration.
Use the compliance and documentation guide to prepare the project evidence.
Send the line scope, site responsibilities and required acceptance documents with the application brief.
Popular searches
Application review, factory acceptance, site preparation, commissioning and handover should use the same container, label and line definitions.
| Stage | Lancing/customer inputs | Useful guide |
|---|---|---|
| Application review | Bottles, labels, output, layout and difficult formats. | Selection guide |
| Factory acceptance | Samples, placement reference, changeovers and interfaces. | FAT checklist |
| Site readiness | Access, verified utilities, conveyors, guards and contacts. | Site preparation |
| Commissioning and training | Production-equivalent materials, operators and acceptance records. | Commissioning checklist |